The “probability to win” is hard to estimate…

Real-time computation (or estimation) of the “probability to win” is difficult. We’ve seem that in soccer games, in elections… but actually, as a professor, I see that frequently when I grade my students.

Consider a classical multiple choice exam. After each question, imagine that you try to compute the probability that the student will pass. Consider here the case where we have 50 questions. Students pass when they have 25 correct answers, or more. Just for simulations, I will assume that students just flip a coin at each question… I have n students, and 50 questions

set.seed(1)
n=10
M=matrix(sample(0:1,size=n*50,replace=TRUE),50,n)

Let X_{i,j} denote the score of student i at question j. Let S_{i,j} denote the cumulated score, i.e. S_{i,j}=X_{i,1}+\cdots+X_{i,j}. At step j, I can get some sort of prediction of the final score, using \hat{T}_{i,j}=50\times S_{i,j}/j. Here is the code

SM=apply(M,2,cumsum)
NB=SM*50/(1:50)

We can actually plot it

plot(NB[,1],type="s",ylim=c(0,50))
abline(h=25,col="blue")
for(i in 2:n) lines(NB[,i],type="s",col="light blue")
lines(NB[,3],type="s",col="red")


But that’s simply the prediction of the final score, at each step. That’s not the computation of the probability to pass !

Let’s try to see how we can do it… If after j questions, the students has 25 correct answer, the probability should be 1 – i.e. if S_{i,j}\geq 25 – since he cannot fail. Another simple case is the following : if after j questions, the number of points he can get with all correct answers until the end is not sufficient, he will fail. That means if S_{i,j}+(50-i+1)< 25 the probability should be 0. Otherwise, to compute the probability to sucess, it is quite straightforward. It is the probability to obtain at least 25-S_{i,j} correct answers, out of 50-j questions, when the probability of success is actually S_{i,j}/j. We recognize the survival probability of a binomial distribution. The code is then simply

PB=NB*NA
for(i in 1:50){
  for(j in 1:n){
    if(SM[i,j]&gt;=25) PB[i,j]=1
    if(SM[i,j]+(50-i+1)&lt;25)   PB[i,j]=0
    if((SM[i,j]&lt;25)&amp;(SM[i,j]+(50-i+1)&gt;=25)) PB[i,j]=1-pbinom(25-SM[i,j],size=(50-i),prob=SM[i,j]/i)
  }}

So if we plot it, we get

plot(PB[,1],type="s",ylim=c(0,1))
abline(h=25,col="red")
for(i in 2:n) lines(PB[,i],type="s",col="light blue")
lines(PB[,3],type="s",col="red")

which is much more volatile than the previous curves we obtained ! So yes, computing the “probability to win” is a complicated exercice ! Don’t blame those who try to find it hard to do !

Of course, things are slightly different if my students don’t flip a coin… this is what we obtain if half of the students are good (2/3 probability to get a question correct) and half is not good (1/3 chance),

If we look at the probability to pass, we usually do not have to wait until the end (the 50 questions) to know who passed and who failed

PS : I guess a less volatile solution can be obtained with a Bayesian approach… if I find some spare time this week, I will try to code it…


OpenEdition suggests that you cite this post as follows:
Arthur Charpentier (November 6, 2018). The “probability to win” is hard to estimate… Freakonometrics. Retrieved September 19, 2024 from https://doi.org/10.58079/ovc5


3 thoughts on “The “probability to win” is hard to estimate…”

  1. Dear Sir/Madam
    I have a question which needs help from a Traverse algorithm expert, can u help me ?

  2. ##Instead of

    M=matrix(sample(0:1,size=n*50,replace=TRUE),50,n)

    ##the code

    M <- replicate(n, sample(0:1,size=50,replace=TRUE))

    ##appears more readable for what you want to do.

    ##Furthermore, your formula/code for the sequential computation of pass
    ##probability appears somewhat complicated. Isn't it just

    SM=apply(M,2,cumsum)
    NB=SM*50/(1:50)
    ##Sequential estimate of success probability (also possible to fix 0.5 here)
    pi.hat = 25 – SM[i,j])
    ## (might be missing somehting? possibly index needs to be shifted by one?)

    prob25ormore <- 1 – pbinom(25 – SM, size=50 – row(SM), prob=pi.hat)
    matplot(1:50, prob25ormore, type="s")